Movano power adapter 19.5v 6.15a (5.5×2.5) 120W Lenovo

28.11

ZZ/LEN195615

Product location: Central warehouse 2

Delivery time: 5-10 business days

In stock

Additional information
Brand

,

Description

DESCRIPTION:


The new Movano IBM Lenovo laptop power supply is equipped with a ferrite filter and STRONG>excellent protection against overvoltage, overheat, overload and overcharge for. IBM Lenovo laptop chargers are designed for the most demanding users who value stress-free and convenient work. The quality of the product is confirmed by the acquired certificates: CE, ROHS, FCC and strict quality control to eliminate possible defects.  .
Electrical Test – Checking the electrical connections of the individual components of the power supply. 
Short and Over Voltage Protection – The response of power supply protection systems is tested as a result of a short circuit and a sudden voltage spike, simulated by applying a high voltage pulse to the input of the power supply.
 Final Testing – Output voltage of the power supply level is tested by subjecting it to continuous load for an hour.  Kit includes power cord, warranty card and user manual.


SUITABILITY: Inphtech

| W650SJIT | W670SJQIT,

Lenovo Series IdeaPad

| Y400 | Y460P | Y470P | Y500 | Y510M TTW | Y510P IFI | Y510P | Y510P 6494 | Y530A | Y550G | Y560 | Y560P | Y570 | Y580 | Y580 2099 | Y580A | Y580N | Y710 | Y730A |

IdeaCentre Series

| C305,

MSI

| GE60 2PC APACHE | GE60 2PC-655XPL | GE60 2QE APACHE PRO | GE60 APACHE PRO-003 | GE620 | GE620DX | GE70 | GE70 2QE APACHE PRO | GE70 APACHE | GE70 APACHE PRO | GE70 APACHE PRO-012 | GP60 | GP70 2PF-415XPL | GP70 2PF-416XPL | GP70 LEOPARD PRO | GS60 | GT620 | GT640X,

PARAMETERS:

  • Manufacturer Movano
  • Output 19.5 V 6.15 A >
  • Power 120 W span>
  • Plug 5.5 x 2.5 mm

GUARANTEE: 12 MONTHS

Tarneinfo

Transport information

Goods are generally dispatched from 3 warehouses. 

Warehouses:

  • Tartu warehouse - delivery time 1-3 business days

  • Central warehouse 1 - delivery time 3-6 business days

  • Central warehouse 2 - delivery time 5-10 business days

In the case of special orders, subsequent or partial deliveries, the delivery time will be specified by Customer Service.