Mitsu power supply unit 19.5v 6.15a (5.5×2.5) 120W Lenovo
41.15€
ZM/LEN195615
Product location: Central warehouse 2
Delivery time: 5-10 business days
In stock
Description
DESCRIPTION:
New power supply for Mitsu Acer laptop equipped with ferrite filter and excellent protection against overvoltage, overheating, overload and overcharging. Acer laptop chargers are aimed at the most demanding user who appreciates relaxed and comfortable work. The quality of the product is confirmed by the received certificates: CE, ROHS, FCC and strict quality control to eliminate possible defects.
HIGH QUALITY
• Temperature tolerance – the effect of high temperatures and low temperatures on the resistance of protection systems and electrical parameters of the power supply.
• Electrical test – testing the correctness of the electrical connections between the individual components of the power supply.
• Short-circuit and overvoltage test – the reaction of the protection systems of the power supply as a result of a short-circuit and a sudden voltage jump, which is simulated by the application of high voltage. a pulse is tested into the input of the power supply.
• Final Test – The output voltage level of the power supply is tested by subjecting it to a continuous load for an hour.
The set includes a power cord, warranty card and user manual.
SUITABILITY:Inphtech
| W650SJIT | W670SJQIT,
Lenovo IdeaPad Series
| Y400 | Y460P | Y470P | Y500 | Y510M TTW | Y510P IFI | Y510P | Y510P 6494 | Y530A | Y550G | Y560 | Y560P | Y570 | Y580 | Y580 2099 | Y580A | Y580N | Y710 | Y730A,
IdeaCentre series
| C305,
MSI
| GE60 2PC APACHE | GE60 2PC-655XPL | GE60 2QE APACHE PRO | GE60 APACHE PRO-003 | GE620 | GE620DX | GE70 | GE70 2QE APACHE PRO | GE70 APACHE | GE70 APACHE PRO | GE70 APACHE PRO-012 | GP60 | GP70 2PF-415XPL | GP70 2PF-416XPL | GP70 LEOPARD PRO | GS60 | GT620 | GT640X,
PARAMETERS:
- Manufacturer Mitsu
- Output 19.5 V 6.15 A >
- Power 120 W span>
- Plug 5.5 x 2.5 mm
GUARANTEE: 12 MONTHS
Tarneinfo
Transport information
Goods are generally dispatched from 3 warehouses.
Warehouses:
Tartu warehouse - delivery time 1-3 business days
Central warehouse 1 - delivery time 3-6 business days
- Central warehouse 2 - delivery time 5-10 business days
In the case of special orders, subsequent or partial deliveries, the delivery time will be specified by Customer Service.