Movano power supply unit 20v 4.5a (8.0×5.5 pin) 90W Lenovo

14.70

ZZ/LEN2045

Product location: Central warehouse 2

Delivery time: 5-10 business days

In stock

Additional information
Brand

,

Description

DESCRIPTION:


The new Movano IBM Lenovo laptop power supply is equipped with a ferrite filter and STRONG>excellent protection against overvoltage, overheat, overload and overcharge for. IBM Lenovo laptop chargers are designed for the most demanding users who value stress-free and convenient work. The quality of the product is confirmed by the acquired certificates: CE, ROHS, FCC and strict quality control to eliminate possible defects.  .
Electrical Test – Checking the electrical connections of the individual components of the power supply. 
Short and Over Voltage Protection – The response of power supply protection systems is tested as a result of a short circuit and a sudden voltage spike, simulated by applying a high voltage pulse to the input of the power supply.
 Final Testing – Output voltage of the power supply level is tested by subjecting it to continuous load for an hour.  Kit includes power cord, warranty card and user manual.


SUITABILITY: IBM ThinkPad Series

| IMPROVED MINIDOCK T | IMPORTANT PORT REPLICATOR | EXTERNAL BATTERY CHARGER | R60 | T60 | X60 | Z60 | Z60M | Z60T | Z61E | Z61M | Z61P,

Lenovo

| 3000 C100 | 3000 C200 | 3000 N100 | 3000 N200 | 3000 N200 0769 | 3000 N200 14W | 3000 N200 15W | B580 | E49,

series 3000

| 3000 | C100 | C200 | N100 | N200 | V100 | V200 | Y100,

Thinkpad series

| L520 | L520 7859 | R400 | R400 7443 | R400 7445 | R500 | R60 | R60I 9456 | R61 7735 | SL300 | SL400 | SL410 | SL410K | SL500 | SL510 | T400 14″ WIDE | T400 6475 | T400 7417 | T420S | T420S 4170 | T420S 4171 | T420SI | T430 | T430S | T430U | T500 | T500 2088 | T500 2241 | T500 2242 | T510 |. T530 |. W520 |. X301 |. i>

ThinkPad series Edge

14 0578 |. PARAMETERS:

  • Manufacturer >Movano
  • Output 20 V 4.5 A
  • Power 90 W
  • Plug 8.0 x 5.5 mm, pin

GUARANTEE: 12 MONTHS

Tarneinfo

Transport information

Goods are generally dispatched from 3 warehouses. 

Warehouses:

  • Tartu warehouse - delivery time 1-3 business days

  • Central warehouse 1 - delivery time 3-6 business days

  • Central warehouse 2 - delivery time 5-10 business days

In the case of special orders, subsequent or partial deliveries, the delivery time will be specified by Customer Service.